Almost 5 years in the making, from the first garage design to throw-downs with ass-hatted District Board of Variance to the resulting garage re-design to the ground-breaking, 50 yards of concrete and over 400 sticks later, I, at last, have the Woodworking Stronghold I so longed for years and years ago.
Continue reading
Monthly Archives: February 2014
Garage Day 24-33: A Whole Lotta Concrete
This was the fourth and final pour for this project, finishing with the last retaining wall and the floating stairs. All said and done, it was approximately 50 yards of concrete, 2500 feet of rebar and 1 MILLION pounds of stress.
Continue reading